Fee simple Expropriations – Batch 1

Those lands and/or interests in land in the City of Toronto described as follows:

All right, title and interest

Part of PIN 21396-0111(LT)
Parts of Lot 4 Plan 12164 designated as Parts 1, 2, 29, 34 & 42 on Reference Plan 66R-30921, City of Toronto

All of PIN 21396-0070(LT)
Parts of Lots 8, 9 & 11 Plan 12164 designated as Parts 3, 6, 7, 11 & 13 on Reference Plan 66R-30921, City of Toronto

All of Leasehold PIN 21396-0089(LT)
Part of Lot 19 Plan 12164 designated as Parts 4, 5, 12, 14 & 28 on Reference Plan 66R-30921, City of Toronto

Part of PIN 21396-0056(LT)
Part of Lots 14, 15 & 25 Plan 12164 designated as Parts 31, 32, 35, 40 & 41 on Reference Plan 66R-30921, City of Toronto

Part of PIN 21396-0057(LT)
Part of Lot 6 Plan 12164 designated as Parts 30, 33 & 46 on Reference Plan 66R-30921, City of Toronto

All of PIN 21395-0107(LT)
Part of Lot 7 Plan 12164 designated as Part 47 on Reference Plan 66R-30921, City of Toronto

Part of PIN 21395-0104(R)
Part of Lot 5 Plan 12164 designated as Part 45 on Reference Plan 66R-30921, City of Toronto

All of Leasehold PIN 21395-0210(LT)
Part of Lot 20 Plan 12164 designated as Part 36 & 44 on Reference Plan 66R-30921, City of Toronto

Temporary Easement Expropriations – Batches 2 & 3

Those lands and/or interests in land in the City of Toronto described as follows:

A Temporary Limited Interest for the purposes of a free, exclusive, uninterrupted and unobstructed temporary easement in gross or rights in the nature of a temporary easement in gross for a term commencing on March 1, 2020 and expiring on December 31, 2024, to occupy and enter and re-enter by all authorized users, including, but not limited to, servants, agents, employees, contractors, sub-contractors and workers, with all necessary material, including, but not limited to, machinery, supplies and equipment at all times in, on, over, through, under, along and upon the lands for all purposes, including, but not limited to, the installation, operation, maintenance and repair of conduits, cables, piping and other materials needed for the extension of, or the connection to, integrated building systems including, but not limited to, fire alarms, sprinklers, domestic water, power, public address (PA), closed-circuit television (CCTV), building automated systems (BAS), wireless fidelity (WiFi), central alarm and control facility (CACF), category (CAT) and data acquisition systems (DAS), connection of any utilities and safety systems, establishing temporary alternative pedestrian access, access to any other Metrolinx lands and/or associated facilities, site clearance, including the disconnection and/or reconnection of any utilities and safety systems, and the erection of signage (collectively, the “Works”). Notwithstanding the exclusivity of this easement, access for pedestrians will remain unobstructed, save and except to the extent Metrolinx is required for reasons of safety or other reasons to temporarily restrict such access to all or parts of the lands subject to this easement for such period or periods of time as may be necessary or advisable to permit the performance of the Works.

Part of PIN 21396-0115(LT)
Part of Lot 3 Plan 12164 designated as Part 16 on Reference Plan 66R-30921, City of Toronto

Part of PIN 21396-0115(LT)
Part of Lot 3 Plan 12164 designated as Part 17 on Reference Plan 66R-30921, City of Toronto

Part of PIN 21396-0115(LT)
Part of Lot 3 Plan 12164 designated as Part 43 on Reference Plan 66R-30921, City of Toronto

Part of PIN 21396-0111(LT)
Part of Lot 4 Plan 12164 designated as Part 18 on Reference Plan 66R-30921, City of Toronto

Part of PIN 21396-0115(LT)
Part of Lot 3 Plan 12164 designated as Part 19 on Reference Plan 66R-30921, City of Toronto

Part of PIN 21396-0111(LT)
Part of Lot 4 Plan 12164 designated as Part 20 on Reference Plan 66R-30921, City of Toronto

Part of PIN 21396-0115(LT)
Part of Lot 3 Plan 12164 designated as Part 21 on Reference Plan 66R-30921, City of Toronto

Part of PIN 21396-0111(LT)
Part of Lot 4 Plan 12164 designated as Part 22 on Reference Plan 66R-30921, City of Toronto

Part of PIN 21396-0115(LT)
Part of Lot 3 Plan 12164 designated as Part 23 on Reference Plan 66R-30921, City of Toronto

Part of PIN 21396-0111(LT)
Part of Lot 4 Plan 12164 designated as Part 24 on Reference Plan 66R-30921, City of Toronto

Part of PIN 21396-0113(LT)
Part of Lots 1 & 3 Plan 12164 designated as Part 25 on Reference Plan 66R-30921, City of Toronto

Part of PIN 21396-0111(LT)
Part of Lot 1 Plan 12164 designated as Part 15 on Reference Plan 66R-30921, City of Toronto

PIN 21395-0019(LT)
Part of Lot 9 Index Plan D970 designated as Part 10 on Reference Plan 66R-30921, City of Toronto

Part of PIN 21396-0111(LT)
Part of Lot 4 Plan 12164 designated as Part 8 on Reference Plan 66R-30921, City of Toronto

All associated with the purposes of facilitating infrastructure improvements and construction of GO Transit rail facilities, corridors, stations, spurs and related services in connection with the GO Platform Widening and New Concourse Project as part of the GO Expansion Program, including, but not limited to, construction, reconstruction, installation, operation, maintenance, demolition, removal, relocation and repairs of tracks, signals, platforms, stairs, tunnels, canopies, elevators, utilities, bridges, spurs, grade separations, layovers, noise walls, retaining walls, tie backs, drainage works, storm management systems, telecommunication equipment and facilities including fibre optic cables, construction of a concourse and associated amenities, and any other Metrolinx and/or associated facilities, and the establishment of new, improved and/or additional access in connection therewith and all other improvements and works ancillary thereto.

Temporary Easement Expropriations – Bathurst/Fort York

Those lands and/or interests in land in the City of Toronto described as follows:

A Temporary Limited Interest (Staging and Access) for the purposes of a free, exclusive, uninterrupted and unobstructed temporary easement in gross or rights in the nature of a temporary easement in gross for a term of three (3) years and six (6) months commencing on three (3) months written notice to take possession, but expiring no later than December 31, 2024, to occupy and enter and re-enter by all authorized users, including, but not limited to, servants, agents, employees, contractors, sub-contractors and workers, with all necessary material, including, but not limited to, light and heavy vehicles, machinery, supplies and equipment at all times in, on, over, through, under, along and upon the lands for all purposes, including, but not limited to, construction, construction staging and laydown areas, placement of temporary construction buildings, establishing temporary alternative pedestrian and vehicular access and/or road and rail diversion, relocation and/or removal of pedestrian access and walkways, road widening, grading, utility relocation, placement and storage of soil and aggregate, equipment, supplies and other material, hoarding, shoring and formwork, geotechnical and/or environmental testing, borehole testing, and other investigative works, access to any other Metrolinx lands and/or associated facilities, grading, site clearance, including all necessary removal of vegetation, soil and aggregate, relocation, reconstruction or demolition of fences and other structures at grade and/or above and below grade including the disconnection and/or reconnection of any utilities, construction of berms and retaining walls, noise walls, temporary removal of any parking areas and all other improvements.

All of PIN 21394-0212(LT)
Part of Lot 20, Index Plan D-970 designated as Part 1 on Reference Plan 66R-30890, City of Toronto

All of PIN 21394-0215(LT)
Part of Lot 20, Index Plan D-970 designated as Part 2 on Reference Plan 66R-30890, City of Toronto

A Temporary Limited Interest (Exclusive Access) for the purposes of a free, exclusive, uninterrupted and unobstructed temporary easement in gross or rights in the nature of a temporary easement in gross for a term of three (3) years and six (6) months commencing on three (3) months written notice to take possession, but expiring no later than December 31, 2024, in, on, over, through, under, along and upon that part of the lands to occupy and enter and re-enter by all authorized users, including, but not limited to, servants, agents, employees, contractors, sub-contractors and workers, with all necessary material, including, but not limited to, light and heavy vehicles, machinery, supplies and equipment at all times and for all purposes, including, but not limited to, establishing temporary alternative pedestrian and vehicular access and/or road and rail diversion, relocation and/or removal of pedestrian access and walkways, hoarding, shoring and formwork, geotechnical and/or environmental testing, borehole testing, and other investigative works, required for establishing temporary construction ingress and egress to and from the station, the rail corridor, and construction staging areas and access to any other Metrolinx and/or associated facilities.

Part of PIN 21394-0043(LT)
Part of Parcels 1 & 4 and Part of the Travelled Road leading to the Queen’s Wharf, Plan 1101 designated as Part 3 on Reference Plan 66R-30890, City of Toronto

Part of PIN 21241-0241(LT)
Part of Parcel 1, Plan 1101 designated as Part 4 on Reference Plan 66R-30890, City of Toronto

A Temporary Limited Interest (Access in Common) for the purposes of a free, uninterrupted and unobstructed temporary easement in gross or rights in the nature of a temporary easement in gross, in common with others, for a term of three (3) years and six (6) months commencing on three (3) months written notice to take possession, but expiring no later than December 31, 2024, in, on, over, through, under, along and upon that part of the lands to occupy and enter and re-enter by all authorized users, including, but not limited to, servants, agents, employees, contractors, sub-contractors and workers, with all necessary material, including, but not limited to, light and heavy vehicles, machinery, supplies and equipment at all times and for all purposes, including, but not limited to, establishing temporary alternative pedestrian and vehicular access and/or road and rail diversion, relocation and/or removal of pedestrian access and walkways, hoarding, shoring and formwork, geotechnical and/or environmental testing, borehole testing, and other investigative works, required for establishing temporary construction ingress and egress to and from the station, the rail corridor, and construction staging areas and access to any other Metrolinx and/or associated facilities.

Part of PIN 21241-0241(LT)
Part of Parcel 1, Plan 1101 designated as Part 5 on Reference Plan 66R-30890, City of Toronto

Part of PIN 21241-0241(LT)
Part of Parcel 1, Plan 1101 and Part of Water Lot fronting the Ordnance Reserve designated as Part 6 on Reference Plan 66R-30890, City of Toronto

Part of PIN 21241-0241(LT)
Part of Parcel 1, Plan 1101 and Part of the Water Lot fronting the Ordnance Reserve designated as Part 7 on Reference Plan 66R-30890, City of Toronto

Part of PIN 21241-0241(LT)
Part of the Water Lot fronting the Ordnance Reserve designated as Part 8 on Reference Plan 66R-30890, City of Toronto

All associated with the purposes of facilitating infrastructure improvements and construction of GO Transit rail facilities, corridors, stations, spurs and related services in connection with the GO Platform Widening and New Concourse Project as part of the GO Expansion Program, including, but not limited to, construction, reconstruction, installation, operation, maintenance, demolition, removal, relocation and repairs of tracks, signals, platforms, stairs, tunnels, canopies, elevators, utilities, bridges, spurs, grade separations, layovers, noise walls, retaining walls, tie backs, drainage works, storm management systems, telecommunication equipment and facilities including fibre optic cables, construction of a concourse and associated amenities, and any other Metrolinx and/or associated facilities, and the establishment of new, improved and/or additional access in connection therewith and all other improvements and works ancillary thereto.


Order in Council 1877/2019